The Nigerian Society of Engineers (NSE) is a professional body of practising engineers in Nigeria. The enrolment test into the body is conducted twice a year (April and September).

Graduates of engineering disciplines with B.Eng are eligible to enrol for this test if they have stayed for a minimum of four years after graduation. The enrolment process involves a lot of stages including oral presentations, technical exhibition and an aptitude test.

This book is a comprehensive collection of questions and answers bank for petroleum engineering.

You may wish to have a look at the NSE General Engineering Questions and Answers

View related materials in our Professional Exams Past Questions and Answers Section

NSE petroleum engineering questions kit are pulled from:

  • Drilling Engineering
  • Production Engineering
  • Reservoir Engineering
  • Enhanced/Improved Oil Recovery
  • Well Test Analysis
  • Basic Geology
  • Well Logging
  • Petroleum Economics
  • etc
Go further and get an edge over others by writing standard CBT test packs (over 2000 past questions loaded) for this exam under Real Exam Settings!
Click on page edge to flip

Nigerian Society of Engineers Questions Bank For Petroleum Engineering

Sample Question 1

1. Gap in geological time scale of stratigraphy is called:
A. conformity
B. unconfirmity
C. both A and B
D. none of the above
2. Kick volume is normally determined from:
A. shut in drill pipe pressure
B. density of the kick
C. pit gain
D. shut in casing pressure
3. Which reservoir drive mechanism has the highest recovery factor?
A. water drive
B. gas cap
C. solution drive
D. combination drive

Sample Question 2

4. Well completion depends on
A. well production strategy
B. interface between wellbore and reservoir
C. number of tubing strings
D. all of the above
5. Which of the following is not a component of IPR?
A. reservoir pressure
B. perforation radius
C. completion thickness
D. fluid density
6. The technology intends to reduce water production is called:
A. water shut-off
B. conformance control
C. both A and B
D. none of the above

Sample Question 3

7. The main method of natural gas transportation is:
A. pipeline
B. tankers
C. truck
D. none of the above
8. As the density of a material increases, the API gravity
A. becomes higher
B. becomes lower
C. is not changed
D. none of the above
9. A sample taken at a specific location in a tank is called:
A. an official sample
B. a tank-side sample
C. a spot sample
D. a single-tank composite sample

Sample Question 4

10. Which of the following installation method is used for pipelines/risers?
A. S-Lay method
B. Z-lay method
C. C-laying method
D. none of the above
11. Support of floating drill rig comes from:
A. axial tension applied to the top of the riser
B. buoyancy along the length of the riser
C. both A and B
D. none of the above
12. The electrical logs are used to determine
A. fluid saturations
B. viscosity
C. density
D. none of the above

Order full pack of Nigerian Society of Engineers Questions Bank For Petroleum Engineering with explanations and get the download link

PRICE: N2000
Effect a bank/POS/ATM/USSD transfer or deposit to
Access Bank Plc
Account Name: ExamBase Resource
Account No: 0108141422
Account Type: Current
Text your name, email address and name of product ordered to 08062633226. Then download the product from your email inbox in the next 2minutes.

Pay online, download a complete copy of Nigerian Society of Engineers Questions Bank For Petroleum Engineering and get the link sent to your mailbox by clicking the Order Now Button. Also, you can download your material from the History Tab (under the profile icon dropdown in the upper right hand corner) after payment!

Order Now Order via WhatsApp
This file is in PDF and can be used on mobile devices. Security settings are enabled to prevent unlawful redistribution.

DISCLAIMER
Kindly note that this comprises of collected practice questions and other helpful materials for this agency's or institution's aptitude tests and does not in anyway insinuate any form of partnership or relationship with the institution or agency whose resource pack is presented here.
BEWARE OF SCAMMERS!
  Customers' Feedback on Nigerian Society of Engineers Questions Bank For Petroleum Engineering
  No review yet. Submit your review if youv've bought this item.